AECC HUNTER NORTH - MCCRORY 161.0kV (J2801)

AECC HUNTER NORTH - MCCRORY 161.0kV is a 130.0 MW solar interconnection project in Woodruff, Arkansas with a current status of withdrawn. It is proposed to connect at AECC HUNTER NORTH - MCCRORY 161.0kV.

130.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameAECC HUNTER NORTH - MCCRORY 161.0kV
Queue IDJ2801
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity130.0 MW
StateArkansas
CountyWoodruff
Point of interconnectionAECC HUNTER NORTH - MCCRORY 161.0kV
Requested (queue) date2023-09-11
Proposed in-service date2026-09-01
Operational date2026-09-01
Withdrawn date2026-10-20
Developer—
Utility / transmission ownerMISO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-05withdrawn_date—2026-10-20high
2026-11-05statusoperationalwithdrawnhigh
2026-10-31phasePhase 2Phase 3low
2026-10-14phasePhase 1Phase 2low
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata