AECC TRUMANN WEST - TRUMANN 161.0kV (J3536)

AECC TRUMANN WEST - TRUMANN 161.0kV is a 190.0 MW solar interconnection project in Poinsett, Arkansas with a current status of withdrawn. It is proposed to connect at AECC TRUMANN WEST - TRUMANN 161.0kV.

190.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameAECC TRUMANN WEST - TRUMANN 161.0kV
Queue IDJ3536
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity190.0 MW
StateArkansas
CountyPoinsett
Point of interconnectionAECC TRUMANN WEST - TRUMANN 161.0kV
Requested (queue) date2024-04-17
Proposed in-service date2028-08-01
Operational date2028-08-01
Withdrawn date2025-12-23
Developer—
Utility / transmission ownerENTERGY ARKANSAS, LLC EATO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-24phaseStudy Not StartedPhase 2low
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.