Aegle Power (27INR0084)

Aegle Power is a 1,536.4 MW gas interconnection project in Cameron, Texas with a current status of operational. It is proposed to connect at (#79501) Kingfisher 345 kV.

1,536.4 MWCapacity
OperationalStatus
CameronMarket
GasTechnology

Project facts

Canonical nameAegle Power
Queue ID27INR0084
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketCameron
TechnologyGas
Capacity1,536.4 MW
StateTexas
CountyCameron
Point of interconnection(#79501) Kingfisher 345 kV
Requested (queue) date2024-07-22
Proposed in-service date
Operational date2027-07-30
Withdrawn date
DeveloperAegle Power LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.