AES REDONDO BEACH UNIT 7 (252)
AES REDONDO BEACH UNIT 7 is a 26.0 MW gas interconnection project in Los Angeles, California with a current status of operational. It is proposed to connect at Redondo Beach Generating Station 220kV switchyard.
26.0 MWCapacity
OperationalStatus
MetroMarket
GasTechnology
Project facts
| Canonical name | AES REDONDO BEACH UNIT 7 |
|---|---|
| Queue ID | 252 |
| Status | operational |
| Source status | COMPLETED |
| Market | Metro |
| Technology | Gas |
| Capacity | 26.0 MW |
| State | California |
| County | Los Angeles |
| Point of interconnection | Redondo Beach Generating Station 220kV switchyard |
| Requested (queue) date | 2007-08-06 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | SCE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata