AES REDONDO BEACH UNIT 7 (252)

AES REDONDO BEACH UNIT 7 is a 26.0 MW gas interconnection project in Los Angeles, California with a current status of operational. It is proposed to connect at Redondo Beach Generating Station 220kV switchyard.

26.0 MWCapacity
OperationalStatus
MetroMarket
GasTechnology

Project facts

Canonical nameAES REDONDO BEACH UNIT 7
Queue ID252
Statusoperational
Source statusCOMPLETED
MarketMetro
TechnologyGas
Capacity26.0 MW
StateCalifornia
CountyLos Angeles
Point of interconnectionRedondo Beach Generating Station 220kV switchyard
Requested (queue) date2007-08-06
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.