Aggreko MSR Grid PC5 (69417_PC5)

Aggreko MSR Grid PC5 is a 10.0 MW battery interconnection project in Cameron, Texas with a current status of operational.

10.0 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameAggreko MSR Grid PC5
Queue ID69417_PC5
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity10.0 MW
StateTexas
CountyCameron
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2026-04-01
Withdrawn date
Developer
Utility / transmission ownerAETS AM LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.