Albatross FIS application fee (26INR0631)

Albatross FIS application fee is a 10.0 MW other interconnection project in Mclennan, Texas with a current status of withdrawn. It is proposed to connect at From Bus #165 Windsor Switch To Bus #161 McGregor.

10.0 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameAlbatross FIS application fee
Queue ID26INR0631
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity10.0 MW
StateTexas
CountyMclennan
Point of interconnectionFrom Bus #165 Windsor Switch To Bus #161 McGregor
Requested (queue) date
Proposed in-service date2026-03-30
Operational date
Withdrawn date2024-12-09
DeveloperAlbatross Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata