Alexandria 345 kV Substation (J1108)

Alexandria 345 kV Substation is a 150.0 MW solar interconnection project in Douglas County, Minnesota with a current status of withdrawn. It is proposed to connect at Alexandria 345 kV Substation.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameAlexandria 345 kV Substation
Queue IDJ1108
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateMinnesota
CountyDouglas County
Point of interconnectionAlexandria 345 kV Substation
Requested (queue) date2018-03-12
Proposed in-service date2021-06-13
Operational date2021-06-13
Withdrawn date2020-03-25
Developer
Utility / transmission ownerMISSOURI RIVER ENERGY SERVICES - TRANSMISSION

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.