ALEXANDRIA - BISON 345.0kV (J3762)

ALEXANDRIA - BISON 345.0kV is a 430.0 MW solar interconnection project in Clay, Minnesota with a current status of operational. It is proposed to connect at ALEXANDRIA - BISON 345.0kV.

430.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameALEXANDRIA - BISON 345.0kV
Queue IDJ3762
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity430.0 MW
StateMinnesota
CountyClay
Point of interconnectionALEXANDRIA - BISON 345.0kV
Requested (queue) date2024-04-18
Proposed in-service date2028-08-01
Operational date2028-08-01
Withdrawn date
Developer
Utility / transmission ownerGREAT RIVER ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata