Algodones Storage (caiso_c15_91)

Algodones Storage is a 1,039.0 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at Imperial Valley 500kV.

1,039.0 MWCapacity
WithdrawnStatus
CAISOMarket
BatteryTechnology

Project facts

Canonical nameAlgodones Storage
Queue IDcaiso_c15_91
Statuswithdrawn
Source statuswithdrawn
MarketCAISO
TechnologyBattery
Capacity1,039.0 MW
StateCalifornia
County
Point of interconnectionImperial Valley 500kV
Requested (queue) date2023-04-17
Proposed in-service date2027-10-01
Operational date
Withdrawn date2024-12-02
Developer
Utility / transmission ownerCAISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata