CAISO — Interconnection Queue Projects

CAISO is associated with 2,869 tracked interconnection projects representing 719,562 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

2,869Projects
374Active
251Operational
2,244Withdrawn
719,562 MWRequested capacity
1Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar+Battery650199,725 MW
Battery784192,386 MW
Gas411115,374 MW
Solar73995,215 MW
Wind23090,812 MW
Other256,960 MW
Wind+Battery56,825 MW
Gas+Battery145,480 MW
Other Storage52,996 MW
Offshore Wind22,412 MW
Solar+Wind+Battery31,014 MW
Geothermal1364 MW

Portfolio by market

MarketProjects
CAISO591

Geographic footprint

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Cuatro Vientoscaiso_c15_465Wind+Battery3,526.0 MWwithdrawnCalifornia
Chokecherry and Sierra Madre Wind Energy Projectcaiso_c15_426Wind3,290.0 MWwithdrawnCalifornia
ATLAS COMPLEX1402Solar+Battery3,200.0 MWactiveLa Paz, Arizona
PATHFINDER RENEWABLE WIND ENERGY741Wind3,000.0 MWwithdrawnPlatte, Wyoming
Ventura Windcaiso_c15_463Wind2,482.0 MWwithdrawnCalifornia
Monterey Windcaiso_c15_462Wind2,462.0 MWwithdrawnCalifornia
Oaks Windcaiso_c15_461Wind2,460.0 MWwithdrawnCalifornia
Charlie Windcaiso_c15_460Wind2,460.0 MWwithdrawnCalifornia
GEMINI WIND NORTH1474Wind2,005.8 MWwithdrawnN/a, California
JOVE SOLAR2023Solar+Battery2,000.0 MWwithdrawnLa Paz, Arizona
ARIZONA A11752Solar+Battery2,000.0 MWwithdrawnMaricopa, Arizona
ALAMITOS ENERGY CENTER939Gas1,902.9 MWwithdrawnLos Angeles, California
Ethan Creekcaiso_c15_534Wind1,870.0 MWwithdrawnCalifornia
EDGEWOOD SOLAR HYBRID1715Solar+Battery1,700.0 MWwithdrawnFresno, California
COWBOY MESA WIND689Wind1,700.0 MWwithdrawnLincoln, New Mexico
EMPIRE2030Battery1,600.0 MWwithdrawnSan Bernadino, California
Gema Hybridcaiso_c15_275Solar+Battery1,546.0 MWwithdrawnCalifornia
Two Bunch Palmscaiso_c15_214Battery1,518.0 MWwithdrawnCalifornia
INTREPID ENERGY1692Wind1,500.1 MWwithdrawnHumboldt, California
SEAWOLF GENERATION1600Wind1,500.0 MWwithdrawnSan Luis Obispo, California
NIMITZ 1 GENERATION1589Wind1,500.0 MWwithdrawnSan Luis Obispo, California
PINEBROOK SOLAR HYBRID ENERGY CENTER1581Solar+Battery1,500.0 MWwithdrawnFresno, California
TEMPEST GENERATION1559Wind1,500.0 MWwithdrawnHumboldt, California
SEARCHLIGHT 1126Wind1,500.0 MWwithdrawnClark, Nevada
NIMITZ 2 GENERATION1590Wind1,500.0 MWwithdrawnSan Luis Obispo, California
HOLMAN1889Wind1,500.0 MWactiveMonterey, California
ISLAY1998Wind1,500.0 MWwithdrawnSan Luis Obispo, California
VINSON ENERGY1747Wind1,499.9 MWwithdrawnSan Luis Obispo, California
EAGLE MOUNTAIN PUMP STORAGE #41193Battery1,408.0 MWwithdrawnRiverside, California
LIGHTHOUSE WIND1738Wind1,400.0 MWwithdrawnSan Luis Obispo, California
SANBORN HYBRID 31632Solar+Battery1,400.0 MWactiveKern, California
BRAVO WIND2014Wind1,400.0 MWwithdrawnSan Luis Obispo, California
ETERNAL 22050Battery1,400.0 MWwithdrawnRiverside, California
EAGLE MOUNTAIN PUMP STORAGE #3697Other1,400.0 MWwithdrawnRiverside, California
EAGLE MOUNTAIN PUMP STORAGE #2567Other1,400.0 MWwithdrawnRiverside, California
IRON HILLS PUMPED STORAGE1525Battery1,400.0 MWwithdrawnRiverside, California
ETERNAL PUMPED STORAGE1759Battery1,400.0 MWwithdrawnRiverside, California
SES SOLAR SIX110Solar1,400.0 MWwithdrawnSan Bernardino, California
Southern Sierra PSPcaiso_c15_63Other1,392.0 MWwithdrawnCalifornia
Helms PSP Upratecaiso_c15_541Other Storage1,392.0 MWwithdrawnCalifornia
EAGLE MOUNTAIN PUMPED STORAGE PROJECT369Other1,300.0 MWwithdrawnRiverside, California
White Hills Solar Projectcaiso_c15_477Solar+Battery1,277.0 MWwithdrawnCalifornia
Magic Valley Wind 1caiso_c15_236Wind+Battery1,238.0 MWwithdrawnCalifornia
Redwood Coast Offshore Wind 2caiso_c15_107Offshore Wind1,206.0 MWwithdrawnCalifornia
Redwood Coast Offshore Wind 1caiso_c15_106Offshore Wind1,206.0 MWwithdrawnCalifornia
Whispering Sands Solarcaiso_c15_446Solar+Battery1,201.0 MWwithdrawnCalifornia
SES SOLAR SEVEN120Solar1,200.0 MWwithdrawnSan Bernardino, California
MORRO BAY MODERNIZATION PROJECT9Gas1,200.0 MWwithdrawnSan Luis Obispo, California
Herculean55031Solar+Battery1,197.1 MWwithdrawnCalifornia
MidBishop Energy Storagecaiso_c15_204Battery1,191.0 MWwithdrawnCalifornia
Mesoncaiso_c15_133Solar+Battery1,190.0 MWwithdrawnCalifornia
Boson2289Solar+Battery1,173.5 MWwithdrawnKern, California
Muon2266Solar+Battery1,169.5 MWactiveFresno, California
Pion2239Battery1,167.7 MWactiveFresno, California
Titan Powercaiso_c15_110Battery1,160.0 MWwithdrawnCalifornia
TESLA POWER PLANT6Gas1,156.0 MWwithdrawnSan Joaquin, California
UMBRIEL2166Solar+Battery1,150.0 MWactiveImperial, California
ALTA 12450Wind1,150.0 MWwithdrawnLos Angeles/kern, California
ALTA 13451Gas1,150.0 MWwithdrawnSan Bernardino, California
ANGELENO SOLAR FARM1625Solar+Battery1,150.0 MWactiveLos Angeles, California
WINGTIP SOLAR 11943Solar+Battery1,150.0 MWactiveMerced, California
DARDEN1949Solar+Battery1,150.0 MWactiveFresno, California
SALINAN ENERGY2008Wind1,148.4 MWwithdrawnSan Luis Obispo, California
LAS BRISAS OFFSHORE WIND1588Wind1,145.0 MWwithdrawnSan Luis Obispo, California
Elixircaiso_c15_55Gas+Battery1,100.0 MWwithdrawnCalifornia
CITY OF VERNON RENEWABLE PROJECT 2505Solar1,100.0 MWwithdrawnKern, California
Hideoutcaiso_c15_56Gas+Battery1,100.0 MWwithdrawnCalifornia
Taurus Windcaiso_c15_115Wind+Battery1,087.0 MWwithdrawnCalifornia
CENTRAL VALLEY I SEGS803Gas1,080.0 MWwithdrawnKern, California
SUNCREST IMPERIAL SEGS770Gas1,080.0 MWwithdrawnImperial, California
Hillside Energy Storage2327Battery1,064.7 MWactiveLos Angeles, California
Blackbirdcaiso_c15_62Solar+Battery1,056.0 MWwithdrawnCalifornia
Egret54559Solar+Battery1,055.6 MWwithdrawnCalifornia
Heroncaiso_c15_64Solar+Battery1,055.0 MWwithdrawnCalifornia
LAVA RIDGE WIND2151Wind1,050.0 MWwithdrawnLincoln, Idaho
RIO HONDO POWER991Gas1,047.0 MWwithdrawnLos Angeles, California
HEARTLAND SOLAR1231Solar1,043.1 MWwithdrawnFresno, California
HEARTLAND SOLAR-21232Solar1,042.5 MWwithdrawnFresno, California
FiveGBcaiso_c15_511Solar+Battery1,040.0 MWwithdrawnCalifornia
Algodones Storagecaiso_c15_91Battery1,039.0 MWwithdrawnCalifornia

Recent material changes

ObservedProjectFieldOldNew
2026-08-18MENIFEE POWER BANKstatusactiveoperational
2026-08-14GREENWOOD ENERGY STORAGEwithdrawn_date2026-08-12
2026-08-14GREENWOOD ENERGY STORAGEstatusactivewithdrawn
2026-08-08AZALEAstatusactiveoperational

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through CAISO.

Start tracking with interXdata