Allatoona Substation #10 (69688_BES02)

Allatoona Substation #10 is a 10.0 MW battery interconnection project in Cobb, Georgia with a current status of operational.

10.0 MWCapacity
OperationalStatus
SOCOMarket
BatteryTechnology

Project facts

Canonical nameAllatoona Substation #10
Queue ID69688_BES02
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologyBattery
Capacity10.0 MW
StateGeorgia
CountyCobb
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2026-06-01
Withdrawn date
Developer
Utility / transmission ownerCOBB ELECTRIC INC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.