COBB ELECTRIC INC — Interconnection Queue Projects

COBB ELECTRIC INC is associated with 7 tracked interconnection projects representing 20 MW of requested capacity.

Entity resolution: this utility / transmission entity rolls up 3 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.

7Projects
3Active
4Operational
0Withdrawn
20 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Battery211 MW
Gas47 MW
Solar12 MW

Geographic footprint

StateProjects
Georgia7

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Allatoona Substation #1069688_BES02Battery10.0 MWoperationalCobb, Georgia
Solar BESS Hybrid63535_GEN03Gas2.0 MWactiveCobb, Georgia
Solar BESS Hybrid63535_GEN04Gas2.0 MWactiveCobb, Georgia
Solar BESS Hybrid63535_GEN02Gas2.0 MWactiveCobb, Georgia
Solar BESS Hybrid63535_SOLARSolar1.5 MWoperationalCobb, Georgia
Solar BESS Hybrid63535_TESTBattery1.0 MWoperationalCobb, Georgia
Solar BESS Hybrid63535_NGGas1.0 MWoperationalCobb, Georgia

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through COBB ELECTRIC INC.

Start tracking with interXdata