Allegheny Tunnel 23 kV (AG1-077)

Allegheny Tunnel 23 kV is a 3.7 MW solar interconnection project in Magoffin, Kentucky with a current status of withdrawn.

3.7 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameAllegheny Tunnel 23 kV
Queue IDAG1-077
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity3.7 MW
StateKentucky
CountyMagoffin
Point of interconnection
Requested (queue) date2020-07-31
Proposed in-service date2022-05-31
Operational date
Withdrawn date2021-09-21
Developer
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.