Altona Energy Storage (1623)
Altona Energy Storage is a 19.9 MW battery interconnection project in Clinton, Delaware with a current status of withdrawn. It is proposed to connect at 46 kV bus at the NYSEG Flat Rock Substation.
19.9 MWCapacity
WithdrawnStatus
DMarket
BatteryTechnology
Project facts
| Canonical name | Altona Energy Storage |
|---|---|
| Queue ID | 1623 |
| Status | withdrawn |
| Source status | 0 |
| Market | D |
| Technology | Battery |
| Capacity | 19.9 MW |
| State | Delaware |
| County | Clinton |
| Point of interconnection | 46 kV bus at the NYSEG Flat Rock Substation |
| Requested (queue) date | 2023-10-25 |
| Proposed in-service date | 2024-03-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Emeren US, LLC |
| Utility / transmission owner | NYSEG |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata