Amelia Dairy Solar (25INR0163)

Amelia Dairy Solar is a 94.1 MW solar interconnection project in Wood, Texas with a current status of withdrawn. It is proposed to connect at 48566 Winnsboro 138 kV.

94.1 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameAmelia Dairy Solar
Queue ID25INR0163
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity94.1 MW
StateTexas
CountyWood
Point of interconnection48566 Winnsboro 138 kV
Requested (queue) date
Proposed in-service date2025-11-25
Operational date
Withdrawn date2023-03-29
DeveloperAmelia Dairy Solar LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata