Anaconda-Tar River 115 kV (AD2-089)

Anaconda-Tar River 115 kV is a 75.0 MW solar interconnection project in Edgecombe, North Carolina with a current status of withdrawn.

75.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameAnaconda-Tar River 115 kV
Queue IDAD2-089
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity75.0 MW
StateNorth Carolina
CountyEdgecombe
Point of interconnection—
Requested (queue) date2018-03-20
Proposed in-service date2020-12-31
Operational date—
Withdrawn date2019-12-09
Developer—
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata