Anchor BESS (21INR0474)

Anchor BESS is a 71.5 MW other interconnection project in Eastland, Texas with a current status of operational. It is proposed to connect at 345 kV Aspire Station (68011).

71.5 MWCapacity
OperationalStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameAnchor BESS
Queue ID21INR0474
Statusoperational
Source statusoperational
MarketERCOT
TechnologyOther
Capacity71.5 MW
StateTexas
CountyEastland
Point of interconnection345 kV Aspire Station (68011)
Requested (queue) date2019-12-02
Proposed in-service date2023-10-27
Operational date2023-10-27
Withdrawn date
DeveloperRANCHLAND WIND PROJECT LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.