Anchor Wind (21INR0387)

Anchor Wind is a 98.9 MW wind interconnection project in Eastland, Texas with a current status of operational. It is proposed to connect at 345 kV Aspire Station (68011).

98.9 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameAnchor Wind
Queue ID21INR0387
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity98.9 MW
StateTexas
CountyEastland
Point of interconnection345 kV Aspire Station (68011)
Requested (queue) date2019-08-25
Proposed in-service date2024-03-28
Operational date2024-04-15
Withdrawn date
DeveloperRANCHLAND WIND PROJECT LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.