Angel City Solar (27INR0144)
Angel City Solar is a 221.0 MW solar interconnection project in Goliad, Texas with a current status of operational. It is proposed to connect at Coleto Creek (# 8164) AEP – Pawnee (#5725) STEC, 25.9 miles from Coleto Creek, 28.2 miles from Pawnee Sub. POI co-ordinates: 28.755, -97.583.
Project facts
| Canonical name | Angel City Solar |
|---|---|
| Queue ID | 27INR0144 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Goliad |
| Technology | Solar |
| Capacity | 221.0 MW |
| State | Texas |
| County | Goliad |
| Point of interconnection | Coleto Creek (# 8164) AEP – Pawnee (#5725) STEC, 25.9 miles from Coleto Creek, 28.2 miles from Pawnee Sub. POI co-ordinates: 28.755, -97.583 |
| Requested (queue) date | 2024-02-07 |
| Proposed in-service date | — |
| Operational date | 2029-09-30 |
| Withdrawn date | — |
| Developer | Angel City Energy Center, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata