Goliad County, Texas — Interconnection Projects

The interXdata warehouse tracks 23 interconnection projects in Goliad, Texas, representing 4,779 MW of requested capacity.

23Total projects
4Active
17Operational
1Withdrawn
4,779 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar102,107 MW
Other81,387 MW
Gas1655 MW
Solar+Battery2454 MW
Battery2176 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Coleto Creek - Fuel Change Only26INR0664Gas655.0 MWoperationalGoliad, Texas
Coleto Creek6178_1Other622.4 MWoperationalGoliad, Texas
Diablo Campo Storage27INR0149Other313.5 MWoperationalGoliad, Texas
Peregrine Solar22INR0283Solar+Battery301.3 MWoperationalGoliad, Texas
Peregrine Solar65979_PSPVSolar300.0 MWoperationalGoliad, Texas
Tulsita Solar21INR0223Solar256.2 MWoperationalGoliad, Texas
Ray Ranch Solar67837_RAYRSSolar255.2 MWactiveGoliad, Texas
Kuy Creek Solar 1 SLF28INR0303Solar234.9 MWoperationalGoliad, Texas
Angel City Solar27INR0144Solar221.0 MWoperationalGoliad, Texas
Lucas Solar SLF24INR0384Solar204.1 MWwithdrawnGoliad, Texas
Keys Hollow Solar Phase II SLF24INR0065Solar200.8 MWoperationalGoliad, Texas
KEYS HOLLOW SOLAR SLF24INR0067Solar200.8 MWoperationalGoliad, Texas
Eighteenmile Solar SLF24INR0061Solar+Battery153.1 MWactiveGoliad, Texas
Kuy Creek Storage 1 SLF28INR0304Other151.5 MWoperationalGoliad, Texas
PEREGRINE BESS23INR0206Other150.0 MWoperationalGoliad, Texas
Peregrine BESS 225INR0078Other150.0 MWoperationalGoliad, Texas
Double A Solar SLF27INR0248Solar132.6 MWoperationalGoliad, Texas
Myers Solar and Storage68172_MYEPVSolar100.9 MWactiveGoliad, Texas
Coleto Creek ESS Addition22INR0275Battery100.1 MWsuspendedGoliad, Texas
Myers Solar and Storage68172_MYEBTBattery75.7 MWactiveGoliad, Texas
Double A Storage SLF27INR0257Other0.0 MWoperationalGoliad, Texas
Keys Hollow Storage Phase II SLF24INR0066Other0.0 MWoperationalGoliad, Texas
KEYS HOLLOW STORAGE SLF24INR0068Other0.0 MWoperationalGoliad, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Goliad County.

Start tracking with interXdata