Anson BAT (22INR0457)

Anson BAT is a 153.6 MW other interconnection project in Jones, Texas with a current status of operational. It is proposed to connect at tap 345 kV 68004 Phantom Hill station .

153.6 MWCapacity
OperationalStatus
JonesMarket
OtherTechnology

Project facts

Canonical nameAnson BAT
Queue ID22INR0457
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketJones
TechnologyOther
Capacity153.6 MW
StateTexas
CountyJones
Point of interconnectiontap 345 kV 68004 Phantom Hill station
Requested (queue) date2020-12-03
Proposed in-service date
Operational date2027-12-01
Withdrawn date
DeveloperAnson II Storage LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata