Jones County, Texas — Interconnection Projects

The interXdata warehouse tracks 31 interconnection projects in Jones, Texas, representing 6,552 MW of requested capacity.

31Total projects
6Active
18Operational
4Withdrawn
6,552 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar184,329 MW
Other71,662 MW
Battery3559 MW
Gas31 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Moccasin Storage27INR0452Other603.1 MWoperationalJones, Texas
LARISA SOLAR21INR0285Solar408.3 MWwithdrawnJones, Texas
Funston Solar (AEP POI)27INR0065Solar355.2 MWsuspendedJones, Texas
Funston Solar29INR0015Solar351.1 MWoperationalJones, Texas
Funston Solar67359_4666Solar350.0 MWactiveJones, Texas
Fox Run Energy Storage25INR0210Other301.4 MWwithdrawnJones, Texas
Tiger Storage23INR0245Battery251.0 MWsuspendedJones, Texas
Skeeter Solar29INR0026Solar251.0 MWoperationalJones, Texas
Tiger Solar23INR0244Solar250.9 MWoperationalJones, Texas
Tiger Solar67357_4666Solar250.0 MWactiveJones, Texas
Crowded Star Solar20INR0241Solar218.8 MWoperationalJones, Texas
Anson 2 Solar69149_ANSN2Solar218.5 MWactiveJones, Texas
Jones City 1 Solar66559_TXJC1Solar215.0 MWactiveJones, Texas
Hamby Solar26INR0440Solar205.8 MWoperationalJones, Texas
Crowded Star I BESS25INR0473Other202.7 MWoperationalJones, Texas
Anson Solar 119INR0081Solar201.5 MWoperationalJones, Texas
Anson Solar 220INR0242Solar200.9 MWoperationalJones, Texas
Anson Solar Center, Phase III21INR0247Solar200.0 MWoperationalJones, Texas
Jones City 2 Solar66893_TXJS2Battery200.0 MWactiveJones, Texas
ANSON Solar Center, LLC64026_SF1Solar200.0 MWoperationalJones, Texas
Crowded Star Solar II22INR0274Solar189.5 MWoperationalJones, Texas
Jones City 2 Solar66893_TXJC2Solar185.0 MWactiveJones, Texas
Anson BAT22INR0457Other153.6 MWoperationalJones, Texas
Solara BESS 124INR0378Other150.0 MWoperationalJones, Texas
Solara BESS 224INR0379Other150.0 MWoperationalJones, Texas
Inertia BESS 324INR0402Battery108.4 MWsuspendedJones, Texas
Crowded Star I BESS25INR0472Other101.4 MWwithdrawnJones, Texas
Nereida Solar21INR0312Solar77.6 MWwithdrawnJones, Texas
WAL53664795_GEN1Gas0.4 MWoperationalJones, Texas
WAL53664795_GEN2Gas0.4 MWoperationalJones, Texas
WAL53664795_GEN3Gas0.4 MWoperationalJones, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Jones County.

Start tracking with interXdata