Antelope 115kV Substation (Neligh East) (GEN-2015-054)

Antelope 115kV Substation (Neligh East) is a 74.0 MW wind interconnection project in Antelope County, Nebraska with a current status of withdrawn. It is proposed to connect at Antelope 115kV Substation (Neligh East).

74.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameAntelope 115kV Substation (Neligh East)
Queue IDGEN-2015-054
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity74.0 MW
StateNebraska
CountyAntelope County
Point of interconnectionAntelope 115kV Substation (Neligh East)
Requested (queue) date2015-10-05
Proposed in-service date
Operational date
Withdrawn date2016-03-11
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata