NPPD — Interconnection Queue Projects

NPPD is associated with 248 tracked interconnection projects representing 40,269 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

248Projects
28Active
44Operational
176Withdrawn
40,269 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Wind15823,450 MW
Solar428,640 MW
Other234,409 MW
Gas122,434 MW
Battery131,337 MW

Geographic footprint

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
GEN-2007-011N02GEN-2007-011N02Other600.0 MWwithdrawnLancaster County, Nebraska
345kV bus of Turtle Creek SubstationGEN-2021-007Wind600.0 MWwithdrawnKnox And Cedar, Nebraska
Gentleman – Red Willow 345kV Line BreakGEN-2018-045Solar550.0 MWwithdrawnBanner, Nebraska
Olive Creek 345 kV SubstationGEN-2024-021Gas540.0 MWoperationalLancaster, Nebraska
Gerald Gentleman-Red Willow 345kV transmssion lineGEN-2019-007Solar500.0 MWwithdrawnLincoln, Nebraska
Keystone 345 kV SubstationGEN-2023-116Wind500.0 MWwithdrawnKeith, Deuel, Garden, Nebraska
New Beatrice Power Station 345 kVGEN-2023-222Other478.0 MWactiveGage, Nebraska
Olive Creek 345 kV SubstationGEN-2023-224Other478.0 MWactiveLancaster, Nebraska
Hoskins 345kVGEN-2016-159Wind427.8 MWwithdrawnStanton, Nebraska
Sidney Keystone 345 kV lineGEN-2019-029Wind404.0 MWwithdrawnKeith And Deuel, Nebraska
Gerald Gentlemen 345kV SubstationGEN-2019-028Solar400.0 MWwithdrawnLincoln County, Ne, Nebraska
Gerald Gentleman Station 345kVGEN-2016-106Wind400.0 MWwithdrawnKeith, Nebraska
GEN-2007-011N01GEN-2007-011N01Other400.0 MWwithdrawnLancaster County, Nebraska
GEN-2001-040NGEN-2001-040NOther400.0 MWwithdrawn8 Sites, Nebraska
GEN-2001-039NGEN-2001-039NOther400.0 MWwithdrawnGrand Island, Nebraska
Gerald Gentleman 345kV switchyardGEN-2018-066Solar400.0 MWwithdrawnLincoln, Nebraska
GEN-2008-121N01GEN-2008-121N01Wind400.0 MWwithdrawnSaline County, Nebraska
Gerald Gentleman-Red Willow 345kV line breakGEN-2018-046Wind400.0 MWwithdrawnBanner, Nebraska
New Beatrice Power Station 345 kVGEN-2024-022Gas390.0 MWoperationalGage, Nebraska
Olive Creek 345 kV SubstationGEN-2024-020Gas390.0 MWoperationalLancaster, Nebraska
GEN-2007-030NGEN-2007-030NGas350.0 MWwithdrawnSheldon, Nebraska
Axtell 345 kV SubstationGEN-2020-011Solar320.0 MWactiveFunk, Nebraska
Hoskins-Twin Church 230 kV LineGEN-2016-116Wind320.0 MWwithdrawnDixon, Nebraska
Hoskins - Twin Church 230kVGEN-2015-042Wind320.0 MWwithdrawnDixon County, Nebraska
McCool 345kV SubstationGEN-2017-210Solar310.0 MWwithdrawnCedar, Nebraska
Pauline 345 kV SubstationGEN-2022-175Solar305.0 MWwithdrawnClay And Adams, Nebraska
Pauline 345kV SubstationGEN-2017-008Solar305.0 MWwithdrawnNuckolls County, Nebraska
Ogallala-Sydney 230kVGEN-2018-017Wind302.4 MWwithdrawnBrule, Nebraska
Antelope - Hoskins 345 kV SubstationGEN-2018-068Wind302.4 MWwithdrawnMadison, Nebraska
Grand Prairie-Grand Island (Holt County NE) 345kVGEN-2015-023Wind300.7 MWoperationalAntelope & Wheeler County, Nebraska
Gerald Gentleman-Red Willow 345kV line breakGEN-2022-198Solar300.0 MWwithdrawnLincoln, Nebraska
Antelope 345kV substationGEN-2021-057Wind300.0 MWwithdrawnAntelope, Nebraska
Holt 345 kV SubstationGEN-2022-200Wind300.0 MWwithdrawnHolt, Nebraska
Shell Creek-Hoskins 345kv LineGEN-2021-058Wind300.0 MWwithdrawnMadison, Nebraska
Tobias 345kV SubstationGEN-2017-181Wind300.0 MWactiveLancaster, Nebraska
Keystone 345 kV SubstationGEN-2023-117Wind300.0 MWwithdrawnKeith, Deuel, Garden, Nebraska
Nebraska Public Power District's (NPPD) 345 kV Red Willow substationGEN-2021-044Wind300.0 MWwithdrawnDundy, Nebraska
Tobias 345kV SubstationGEN-2015-088Wind300.0 MWoperationalSaline, Nebraska
North Hastings - Grand Island 230 kV lineGEN-2024-349Solar300.0 MWwithdrawnHall, Nebraska
Gerald Gentleman-Red Willow 345kV lineGEN-2021-060Wind300.0 MWwithdrawnLincoln, Nebraska
Hoskins 345kVGEN-2016-021Wind298.5 MWoperationalDixon County, Nebraska
Crooked Creek 230 kVGEN-2022-050Wind272.0 MWwithdrawnDawson And Buffalo, Nebraska
New Beatrice Power Station 345 kVGEN-2024-023Gas270.0 MWoperationalGage, Nebraska
Enders 115 kV SubstationGEN-2022-077Solar255.0 MWwithdrawnChase, Nebraska
Axtell – Post Rock 345 kVGEN-2016-050Wind250.7 MWoperationalWebster Co, Nebraska
Sweetwater 345kVGEN-2017-001Wind250.0 MWwithdrawnCuster, Nebraska
Twin Church 230 kV SubstationGEN-2023-199Solar250.0 MWactiveDakota, Nebraska
GEN-2006-038N009GEN-2006-038N009Wind250.0 MWwithdrawnKnox County, Nebraska
Bobcat 345 kVGEN-2021-099Wind250.0 MWwithdrawnEllis, Oklahoma
Sweetwater 345 kV SubstationGEN-2023-133Wind250.0 MWwithdrawnCuster, Nebraska
Antelope - Hoskins 345 kV lineGEN-2024-140Solar250.0 MWwithdrawnMercer, Nebraska
Hoskins 345kV SubstationGEN-2017-201Wind250.0 MWactiveWayne County, Nebraska
GEN-2001-029N1GEN-2001-029N1Other250.0 MWwithdrawnHastings, Nebraska
GEN-2001-029NGEN-2001-029NGas250.0 MWoperationalBeatrice, Nebraska
Shell Creek-Hoskins 345kv Line BreakGEN-2018-083Wind250.0 MWwithdrawnMadison, Nebraska
Gerald Gentleman Substation 345 kVGEN-2020-051Solar250.0 MWwithdrawnSutherland, Nebraska
Cherry County 345kVGEN-2013-024Wind250.0 MWwithdrawnCherry, Nebraska
NPPD Sidney to Keystone 345 kV LineGEN-2021-037Wind244.2 MWwithdrawnPerkins & Keith, Nebraska
New GGS Satellite 345 kV SubstationGEN-2022-210Solar240.0 MWwithdrawnLincoln, Nebraska
Tap on the Sweetwater to Gerald Gentleman 345 kV LineGEN-2021-073Solar240.0 MWwithdrawnLincoln, Nebraska
New Beatrice Power Station 345 kVGEN-2023-223Other239.0 MWactiveGage, Nebraska
New switching station on Gentleman to Sweetwater 345kV lineGEN-2018-125Wind231.0 MWactiveLincoln, Nebraska
Hoskins 345kVGEN-2016-043Wind230.0 MWoperationalWayne County, Nebraska
Ogallala 230kVGEN-2013-021Wind229.5 MWwithdrawnKeith, Nebraska
Moore (GEN-2015-088 Tap)-Pauline 345kVGEN-2016-096Wind227.7 MWwithdrawnFillmore, Nebraska
New GGS Satellite 345 kV SubstationGEN-2022-212Solar225.0 MWwithdrawnLincoln, Nebraska
Antelope - Hoskins 345 kVGEN-2018-131Solar221.4 MWactivePierce, Nebraska
GEN-2004-018NGEN-2004-018NOther220.0 MWwithdrawnHastings, Nebraska
Olive Creek 345 kV SubstationGEN-2023-225Other217.0 MWactiveLancaster, Nebraska
Orleans-Holdrege Substation 115kVGEN-2020-013Solar215.0 MWactiveOrleans, Nebraska
Antelope 115kVGEN-2013-032Wind202.5 MWoperationalAntelope, Nebraska
Antelope - Hoskins 345 kVGEN-2018-132Solar201.6 MWactivePierce, Nebraska
Meadow Grove 230kVGEN-2008-086N02Wind201.0 MWoperationalAntelope County, Nebraska
GEN-2008-030NGEN-2008-030NWind201.0 MWwithdrawnDixon County, Nebraska
Wakefield 230kVGEN-2010-051Wind200.0 MWoperationalDixon County, Nebraska
Holt County 345kVGEN-2017-144Wind200.0 MWactiveHolt, Antelope, Wheeler, Nebraska
Hoskins 345 kV Substation via Turtle Creek 345 kV SubstationGEN-2023-216Wind200.0 MWwithdrawnKnox And Cedar, Nebraska
Tap Hoskins - Twin Church 230kVGEN-2012-018Wind200.0 MWwithdrawnDixon County, Nebraska
Columbus East 345GEN-2013-040Wind200.0 MWwithdrawnButler, Nebraska
Hoskins 345 kV Substation via Turtle Creek 345 kV SubstationGEN-2023-217Wind200.0 MWwithdrawnKnox And Cedar, Nebraska

Recent material changes

ObservedProjectFieldOldNew
2026-10-06Hoskins 345 kV Substationproposed_online_date2024-12-312027-11-01
2026-09-20Antelope - Hoskins 345 kVproposed_online_date2026-12-312031-12-01
2026-08-12Pawnee Lake 115 kV Substationstatusoperationalwithdrawn
2026-08-12Pawnee Lake 115 kV Substationwithdrawn_date—2026-08-10
2026-08-12Pawnee Lake 115 kV Substationproposed_online_date—2028-05-17
2026-08-12Pawnee Lake 115 kV Substationoperational_date2028-02-17—
2026-08-12Geneva 115 kV Substationstatusoperationalwithdrawn
2026-08-12Geneva 115 kV Substationwithdrawn_date—2026-08-10
2026-08-12Geneva 115 kV Substationproposed_online_date—2033-12-30
2026-08-12Geneva 115 kV Substationoperational_date2033-10-03—
2026-08-12Twin Church 230 kV Substationstatusoperationalwithdrawn
2026-08-12Twin Church 230 kV Substationwithdrawn_date—2026-08-10

Explore related data

Source last checked2026-07-31
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through NPPD.

Start tracking with interXdata