Aratina Solar Center 2 (64215_45MGA)

Aratina Solar Center 2 is a 150.0 MW solar interconnection project in Kern, California with a current status of active.

150.0 MWCapacity
ActiveStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameAratina Solar Center 2
Queue ID64215_45MGA
Statusactive
Source status(TS) Construction complete, but not yet in commercial operation
MarketCISO
TechnologySolar
Capacity150.0 MW
StateCalifornia
CountyKern
Point of interconnection—
Requested (queue) date—
Proposed in-service date2026-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission owner45MG 8me LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata