Argos Solar (1495)

Argos Solar is a 150.0 MW solar interconnection project in Tompkins, New York with a current status of withdrawn. It is proposed to connect at Etna 115 kV substation.

150.0 MWCapacity
WithdrawnStatus
CMarket
SolarTechnology

Project facts

Canonical nameArgos Solar
Queue ID1495
Statuswithdrawn
Source status0
MarketC
TechnologySolar
Capacity150.0 MW
StateNew York
CountyTompkins
Point of interconnectionEtna 115 kV substation
Requested (queue) date2022-12-22
Proposed in-service date2024-11-30
Operational date
Withdrawn date
DeveloperACE DEVCO NC, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata