ARIDA SOLAR FARM (1522)

ARIDA SOLAR FARM is a 370.0 MW solar+battery interconnection project in Clark, Nevada with a current status of active. It is proposed to connect at Mohave Substation 500kV.

370.0 MWCapacity
ActiveStatus
EOPMarket
Solar+BatteryTechnology

Project facts

Canonical nameARIDA SOLAR FARM
Queue ID1522
Statusactive
Source statusACTIVE
MarketEOP
TechnologySolar+Battery
Capacity370.0 MW
StateNevada
CountyClark
Point of interconnectionMohave Substation 500kV
Requested (queue) date2018-04-16
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata