Arnold 115kV (Z1-066)

Arnold 115kV is a 10.4 MW battery interconnection project in Somerset, Pennsylvania with a current status of operational.

10.4 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameArnold 115kV
Queue IDZ1-066
Statusoperational
Source statusIn Service
Market
TechnologyBattery
Capacity10.4 MW
StatePennsylvania
CountySomerset
Point of interconnection
Requested (queue) date2013-09-30
Proposed in-service date
Operational date2016-03-01
Withdrawn date
Developer
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata