Arnolds Corner 34.5 kV (AG2-020 - moved to TC2)

Arnolds Corner 34.5 kV is a 7.0 MW battery interconnection project in King George, Virginia with a current status of withdrawn.

7.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameArnolds Corner 34.5 kV
Queue IDAG2-020 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity7.0 MW
StateVirginia
CountyKing George
Point of interconnection
Requested (queue) date2020-10-23
Proposed in-service date2022-12-30
Operational date
Withdrawn date2025-07-03
Developer
Utility / transmission ownerDominion

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata