Arnolds Corner Energy Storage is a 7.0 MW battery interconnection project in King George, Virginia with a current status of withdrawn. It is proposed to connect at Arnolds Corner 34.5 kV.
7.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology
Project facts
| Canonical name | Arnolds Corner Energy Storage |
|---|---|
| Queue ID | AG2-020 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | PJM |
| Technology | Battery |
| Capacity | 7.0 MW |
| State | Virginia |
| County | King George |
| Point of interconnection | Arnolds Corner 34.5 kV |
| Requested (queue) date | 2020-10-23 |
| Proposed in-service date | 2022-12-30 |
| Operational date | — |
| Withdrawn date | 2025-07-03 |
| Developer | Arnold Corner Energy Storage 1 LLC |
| Utility / transmission owner | Dominion |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata