Ault 345 station (2025-G1)
Ault 345 station is a 250.0 MW solar interconnection project in Weld County,, Colorado with a current status of active. It is proposed to connect at Ault 345 station.
250.0 MWCapacity
ActiveStatus
COMarket
SolarTechnology
Project facts
| Canonical name | Ault 345 station |
|---|---|
| Queue ID | 2025-G1 |
| Status | active |
| Source status | FACILITY STUDY STAGE |
| Market | CO |
| Technology | Solar |
| Capacity | 250.0 MW |
| State | Colorado |
| County | Weld County, |
| Point of interconnection | Ault 345 station |
| Requested (queue) date | 2025-01-14 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | WAPA/BEPC/HCPD Integrated System |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; wapa-rm-oasis. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.