Ault 345 station (2025-G1)

Ault 345 station is a 250.0 MW solar interconnection project in Weld County,, Colorado with a current status of active. It is proposed to connect at Ault 345 station.

250.0 MWCapacity
ActiveStatus
COMarket
SolarTechnology

Project facts

Canonical nameAult 345 station
Queue ID2025-G1
Statusactive
Source statusFACILITY STUDY STAGE
MarketCO
TechnologySolar
Capacity250.0 MW
StateColorado
CountyWeld County,
Point of interconnectionAult 345 station
Requested (queue) date2025-01-14
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; wapa-rm-oasis. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata