Aureola Solar (21INR0302)

Aureola Solar is a 203.0 MW solar interconnection project in Milam, Texas with a current status of operational. It is proposed to connect at tap 345kV 3687 Bell E - 39950 TNTNP One, one-third from Bell.

203.0 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameAureola Solar
Queue ID21INR0302
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity203.0 MW
StateTexas
CountyMilam
Point of interconnectiontap 345kV 3687 Bell E - 39950 TNTNP One, one-third from Bell
Requested (queue) date2019-12-18
Proposed in-service date2024-08-17
Operational date2024-08-12
Withdrawn date
DeveloperBen Milam Solar 5
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata