Avenida Del Sul (2243)

Avenida Del Sul is a 151.3 MW solar interconnection project in Inyo, California with a current status of withdrawn. It is proposed to connect at INYOKERN 115 kV.

151.3 MWCapacity
WithdrawnStatus
CAISOMarket
SolarTechnology

Project facts

Canonical nameAvenida Del Sul
Queue ID2243
Statuswithdrawn
Source statuswithdrawn
MarketCAISO
TechnologySolar
Capacity151.3 MW
StateCalifornia
CountyInyo
Point of interconnectionINYOKERN 115 kV
Requested (queue) date2023-04-17
Proposed in-service date2029-03-30
Operational date
Withdrawn date2025-11-20
Developer
Utility / transmission ownerSCE

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata