Aviator Wind (63209_AVTOR)

Aviator Wind is a 525.0 MW wind interconnection project in Coke, Texas with a current status of operational.

525.0 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameAviator Wind
Queue ID63209_AVTOR
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity525.0 MW
StateTexas
CountyCoke
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2021-06-01
Withdrawn date—
Developer—
Utility / transmission ownerAviator Wind, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata