Aviator Wind (63209_AVTOR)

Aviator Wind is a 525.0 MW wind interconnection project in Coke, Texas with a current status of operational.

525.0 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameAviator Wind
Queue ID63209_AVTOR
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity525.0 MW
StateTexas
CountyCoke
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2021-06-01
Withdrawn date
Developer
Utility / transmission ownerAviator Wind, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata