Coke County, Texas — Interconnection Projects
The interXdata warehouse tracks 18 interconnection projects in Coke, Texas, representing 2,701 MW of requested capacity.
18Total projects
4Active
12Operational
2Withdrawn
2,701 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 2 | 1,050 MW |
| Solar | 6 | 780 MW |
| Battery | 3 | 485 MW |
| Other | 3 | 384 MW |
| Gas | 4 | 2 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Aviator Wind | 19INR0156 | Wind | 525.0 MW | operational | Coke, Texas |
| Aviator Wind | 63209_AVTOR | Wind | 525.0 MW | operational | Coke, Texas |
| Roboman Solar | 27INR0453 | Solar | 272.6 MW | operational | Coke, Texas |
| Coke BESS | 28INR0155 | Other | 220.3 MW | operational | Coke, Texas |
| Coke BESS | 68668_RIC90 | Battery | 220.0 MW | active | Coke, Texas |
| Ulysses Solar | 21INR0253 | Solar | 151.2 MW | operational | Coke, Texas |
| Rocky Point BESS | 27INR0303 | Battery | 151.0 MW | active | Coke, Texas |
| Tennyson Solar | 69605_TENN | Solar | 150.0 MW | active | Coke, Texas |
| MEISSA SOLAR | 21INR0311 | Solar | 136.4 MW | withdrawn | Coke, Texas |
| Hayrick BESS | 67779_GRS5 | Battery | 113.9 MW | active | Coke, Texas |
| Hayrick BESS | 25INR0135 | Other | 113.9 MW | operational | Coke, Texas |
| Fort Chadbourne Cattle BESS | 26INR0218 | Other | 50.2 MW | operational | Coke, Texas |
| OLIVE SOLAR | 21INR0273 | Solar | 39.6 MW | withdrawn | Coke, Texas |
| BlueBell Solar | 16INR0019 | Solar | 30.0 MW | operational | Coke, Texas |
| Jameson Gas Processing Plant | 55052_622 | Gas | 0.5 MW | operational | Coke, Texas |
| Jameson Gas Processing Plant | 55052_GN410 | Gas | 0.5 MW | operational | Coke, Texas |
| Jameson Gas Processing Plant | 55052_621 | Gas | 0.4 MW | operational | Coke, Texas |
| Jameson Gas Processing Plant | 55052_620 | Gas | 0.4 MW | operational | Coke, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| ABEI ENERGY&INFRASTRUCTURE LLC | 1 | 40 MW |
| Nicole BESS | 1 | 151 MW |
| Nextera | 1 | 30 MW |
| BLUE STONE RENEWABLE XXI LLC | 1 | 136 MW |
| Apex Clean | 1 | 525 MW |
| Roboman Solar, LLC | 1 | 273 MW |
| BNB Renewable Energy, LLC | 1 | 151 MW |
| Coke ESS, LLC | 1 | 220 MW |
| Gransolar Texas Nineteen, LLC | 1 | 114 MW |
| Fort Chadbourne BESS | 1 | 50 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.