Axtell-Post Rock 345 kV (GEN-2018-060)
Axtell-Post Rock 345 kV is a 50.0 MW wind interconnection project in Webster, Nebraska with a current status of withdrawn. It is proposed to connect at Axtell-Post Rock 345 kV.
50.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology
Project facts
| Canonical name | Axtell-Post Rock 345 kV |
|---|---|
| Queue ID | GEN-2018-060 |
| Status | withdrawn |
| Source status | TERMINATED |
| Market | NE |
| Technology | Wind |
| Capacity | 50.0 MW |
| State | Nebraska |
| County | Webster |
| Point of interconnection | Axtell-Post Rock 345 kV |
| Requested (queue) date | 2018-05-29 |
| Proposed in-service date | 2026-12-31 |
| Operational date | — |
| Withdrawn date | 2026-03-25 |
| Developer | — |
| Utility / transmission owner | NPPD |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata