Azalea Springs Solar (19INR0110)

Azalea Springs Solar is a 181.0 MW solar interconnection project in Angelina, Texas with a current status of operational. It is proposed to connect at tap 138kV Jim English – Lufkin Chipper Mill.

181.0 MWCapacity
OperationalStatus
AngelinaMarket
SolarTechnology

Project facts

Canonical nameAzalea Springs Solar
Queue ID19INR0110
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketAngelina
TechnologySolar
Capacity181.0 MW
StateTexas
CountyAngelina
Point of interconnectiontap 138kV Jim English – Lufkin Chipper Mill
Requested (queue) date2017-07-26
Proposed in-service date
Operational date2026-07-15
Withdrawn date
DeveloperAZALEA SPRINGS SOLAR PARK LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata