Angelina County, Texas — Interconnection Projects

The interXdata warehouse tracks 16 interconnection projects in Angelina, Texas, representing 2,890 MW of requested capacity.

16Total projects
3Active
9Operational
4Withdrawn
2,890 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas41,500 MW
Battery5629 MW
Other5400 MW
Solar2361 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Longleaf II Power Station30INR0114Gas600.0 MWactiveAngelina, Texas
Longleaf Power Station26INR0294Gas600.0 MWoperationalAngelina, Texas
Champion Road BESS28INR0300Battery206.0 MWactiveAngelina, Texas
Kruth Storage24INR0252Battery203.0 MWwithdrawnAngelina, Texas
Sun Angel ESS27INR0247Other201.5 MWoperationalAngelina, Texas
Sun Angel ESS68362_SABS1Battery200.0 MWactiveAngelina, Texas
Azalea Springs Solar19INR0110Solar181.0 MWoperationalAngelina, Texas
Azalea Springs Solar Park68470_AZ1Solar180.0 MWoperationalAngelina, Texas
Avocet20INR0211Gas150.0 MWwithdrawnAngelina, Texas
HERON121INR0394Gas150.0 MWwithdrawnAngelina, Texas
Solar Star North Herty Storage24INR0174Other125.9 MWoperationalAngelina, Texas
Jefferson Enterprise Energy21INR0543Other53.0 MWwithdrawnAngelina, Texas
Lufkin South BESS24INR0587Other9.9 MWoperationalAngelina, Texas
Diboll Bess23INR0522Other9.9 MWoperationalAngelina, Texas
Lufkin South BESS66789_LUFKSBattery9.9 MWoperationalAngelina, Texas
Diboll BESS66794_DIBOLBattery9.9 MWoperationalAngelina, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Angelina County.

Start tracking with interXdata