B Johnson Substation (L0425)

B Johnson Substation is a 11.0 MW other interconnection project in Multnomah, Oregon with a current status of withdrawn. It is proposed to connect at St. Johns-St. Helens 115kV line.

11.0 MWCapacity
WithdrawnStatus
ORMarket
OtherTechnology

Project facts

Canonical nameB Johnson Substation
Queue IDL0425
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyOther
Capacity11.0 MW
StateOregon
CountyMultnomah
Point of interconnectionSt. Johns-St. Helens 115kV line
Requested (queue) date2017-11-28
Proposed in-service date2020-11-30
Operational date
Withdrawn date
DeveloperColumbia River People's Utility District
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.