Barterbrook-Stuarts Draft 115 kV is a 83.0 MW solar interconnection project in Augusta, Virginia with a current status of withdrawn.

83.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBarterbrook-Stuarts Draft 115 kV
Queue IDAE1-084
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity83.0 MW
StateVirginia
CountyAugusta
Point of interconnection
Requested (queue) date2018-08-30
Proposed in-service date2023-10-31
Operational date
Withdrawn date2024-07-11
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata