Barton Chapel Wind Farm (57156_BC)

Barton Chapel Wind Farm is a 120.0 MW wind interconnection project in Jack, Texas with a current status of operational.

120.0 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameBarton Chapel Wind Farm
Queue ID57156_BC
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity120.0 MW
StateTexas
CountyJack
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2009-01-01
Withdrawn date—
Developer—
Utility / transmission ownerAvangrid Power LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.