Jack County, Texas — Interconnection Projects

The interXdata warehouse tracks 23 interconnection projects in Jack, Texas, representing 7,924 MW of requested capacity.

23Total projects
1Active
20Operational
1Withdrawn
7,924 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Other113,172 MW
Solar63,011 MW
Gas1660 MW
Solar+Battery1654 MW
Wind3380 MW
Battery147 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Dovetail Solar 224INR0095Solar666.1 MWoperationalJack, Texas
Dovetail Solar 124INR0094Solar666.1 MWoperationalJack, Texas
Dovetail Solar 324INR0097Solar666.1 MWoperationalJack, Texas
Jack County III – 345 kV26INR0351Gas660.0 MWoperationalJack, Texas
Pinnington Solar24INR0010Solar+Battery653.7 MWactiveJack, Texas
Hecate Energy Longhorn Solar LLC68839_RRPSSolar650.0 MWoperationalJack, Texas
Dovetail Storage24INR0098Other508.7 MWoperationalJack, Texas
Pinnington Storage24INR0011Other502.7 MWoperationalJack, Texas
O'Bannion Energy Storage25INR0657Other306.4 MWoperationalJack, Texas
Wooderson Energy Storage25INR0660Other306.4 MWoperationalJack, Texas
Fortuna Wind22INR0301Other295.3 MWoperationalJack, Texas
Possum Kingdom Solar24INR0118Solar262.2 MWoperationalJack, Texas
Campsey Wind23INR0174Other238.3 MWoperationalJack, Texas
Liberty Senate Energy Storage 123INR0334Other207.4 MWoperationalJack, Texas
Lightning Ridge Energy Storage26INR0460Other204.7 MWoperationalJack, Texas
Possum Kingdom BESS24INR0375Other200.9 MWoperationalJack, Texas
Beitel Energy Storage26INR0185Other200.6 MWoperationalJack, Texas
JackGard BESS26INR0215Other200.6 MWoperationalJack, Texas
Senate Wind LLC57981_GEN1Wind150.0 MWoperationalJack, Texas
Barton Chapel Wind Farm57156_BCWind120.0 MWoperationalJack, Texas
Keechi Wind58838_KW1Wind110.0 MWoperationalJack, Texas
Wizard Ranch Solar25INR0449Solar100.5 MWsuspendedJack, Texas
Jack Barton BESS24INR0304Battery47.3 MWwithdrawnJack, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.