Bassett Energy Storage (C24-270)

Bassett Energy Storage is a 79.9 MW battery interconnection project in Steuben, New York with a current status of active. It is proposed to connect at Spencer Hill 115 kV Substation.

79.9 MWCapacity
ActiveStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameBassett Energy Storage
Queue IDC24-270
Statusactive
Source statusactive
MarketNYISO
TechnologyBattery
Capacity79.9 MW
StateNew York
CountySteuben
Point of interconnectionSpencer Hill 115 kV Substation
Requested (queue) date2024-09-24
Proposed in-service date2028-07-01
Operational date
Withdrawn date
DeveloperBassett Energy Storage
Utility / transmission ownerNYSEG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata