Battery Storage (1107)

Battery Storage is a 189.0 MW battery interconnection project in Plymouth, Massachusetts with a current status of withdrawn. It is proposed to connect at Eversource (NSTAR - South) 115 kV Wareham Line 108.

189.0 MWCapacity
WithdrawnStatus
SEMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1107
Statuswithdrawn
Source statusW
MarketSEMA
TechnologyBattery
Capacity189.0 MW
StateMassachusetts
CountyPlymouth
Point of interconnectionEversource (NSTAR - South) 115 kV Wareham Line 108
Requested (queue) date2021-03-16
Proposed in-service date2027-05-14
Operational date
Withdrawn date2025-01-08
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata