Battery Storage (1335)
Battery Storage is a 205.8 MW battery interconnection project in Bristol, Massachusetts with a current status of withdrawn. It is proposed to connect at Non-PTF 115KV lines ET and W owned by TMLP between Cleary Flood Substation and Substation #16 (W Water St), approximately 1.26 miles from Cleary Flood. Project would interconnect half of the net MW capability to each line..
Project facts
| Canonical name | Battery Storage |
|---|---|
| Queue ID | 1335 |
| Status | withdrawn |
| Source status | W |
| Market | SEMA |
| Technology | Battery |
| Capacity | 205.8 MW |
| State | Massachusetts |
| County | Bristol |
| Point of interconnection | Non-PTF 115KV lines ET and W owned by TMLP between Cleary Flood Substation and Substation #16 (W Water St), approximately 1.26 miles from Cleary Flood. Project would interconnect half of the net MW capability to each line. |
| Requested (queue) date | 2022-11-10 |
| Proposed in-service date | 2027-04-01 |
| Operational date | — |
| Withdrawn date | 2024-10-08 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata