Battery Storage (1421)

Battery Storage is a 175.7 MW battery interconnection project in Bristol, Massachusetts with a current status of withdrawn. It is proposed to connect at 41.987864, -71.265095 Tapping to National Grid 115kV line C181.

175.7 MWCapacity
WithdrawnStatus
SEMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1421
Statuswithdrawn
Source statusW
MarketSEMA
TechnologyBattery
Capacity175.7 MW
StateMassachusetts
CountyBristol
Point of interconnection41.987864, -71.265095 Tapping to National Grid 115kV line C181
Requested (queue) date2023-07-06
Proposed in-service date2024-09-08
Operational date
Withdrawn date2024-01-26
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata