Battery Storage (1442)

Battery Storage is a 151.6 MW battery interconnection project in Bristol, Massachusetts with a current status of withdrawn. It is proposed to connect at Primary: Eversource 115 kV Cross Road Line 111, alternate: line 109.

151.6 MWCapacity
WithdrawnStatus
SEMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1442
Statuswithdrawn
Source statusW
MarketSEMA
TechnologyBattery
Capacity151.6 MW
StateMassachusetts
CountyBristol
Point of interconnectionPrimary: Eversource 115 kV Cross Road Line 111, alternate: line 109
Requested (queue) date2023-09-18
Proposed in-service date2027-05-31
Operational date
Withdrawn date2024-09-04
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata