Battery Storage (1460)

Battery Storage is a 350.0 MW battery interconnection project in Bristol, Massachusetts with a current status of withdrawn. It is proposed to connect at Customer built substation with a tap into the west-most 345kV line exiting the NG 345kV Brayton Point substation.

350.0 MWCapacity
WithdrawnStatus
RIMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1460
Statuswithdrawn
Source statusW
MarketRI
TechnologyBattery
Capacity350.0 MW
StateMassachusetts
CountyBristol
Point of interconnectionCustomer built substation with a tap into the west-most 345kV line exiting the NG 345kV Brayton Point substation
Requested (queue) date2023-10-12
Proposed in-service date2027-09-30
Operational date
Withdrawn date2026-02-27
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata