Bayonne Energy Storage II (C24-355)

Bayonne Energy Storage II is a 400.0 MW battery interconnection project in Hudson, New Jersey with a current status of withdrawn. It is proposed to connect at Gowanus Substation 345 kV.

400.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameBayonne Energy Storage II
Queue IDC24-355
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity400.0 MW
StateNew Jersey
CountyHudson
Point of interconnectionGowanus Substation 345 kV
Requested (queue) date2024-10-15
Proposed in-service date
Operational date
Withdrawn date
DeveloperAMBAR POWER HOLDCO LLC
Utility / transmission ownerCONED

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata