Beachwood Energy Storage (Mark One BESS) (22INR0447)

Beachwood Energy Storage (Mark One BESS) is a 100.5 MW other interconnection project in Brazoria, Texas with a current status of withdrawn. It is proposed to connect at 42110 Angleton 138kV.

100.5 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameBeachwood Energy Storage (Mark One BESS)
Queue ID22INR0447
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity100.5 MW
StateTexas
CountyBrazoria
Point of interconnection42110 Angleton 138kV
Requested (queue) date2020-12-02
Proposed in-service date2024-11-01
Operational date
Withdrawn date2023-12-08
DeveloperMark One Energy Storage, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.